Saturday, September 29, 2012

Starting the assembly...

Rachel installing the first rivet on the first F-panel.  This was the very first permanent task that was performed.
Kate installed the second rivet.  She didn't like the noise of the air compressor. 
The passenger side F-panel and front suspension.  The grease boot gave me a bit of trouble, but only because I was trying to do it wrong.  Getting the torque right on the bolts was a bit of a challenge too, but we got it done.
The same as above with the addition of the front brakes.

1 comment:

  1. The last picture didn't want a caption for some reason. It is the IRS pumpkin once it was installed a second time. We had to take it back out to do a little work to make the bushings fit snuggly.