Rachel installing the first rivet on the first F-panel. This was the very first permanent task that was performed. |
Kate installed the second rivet. She didn't like the noise of the air compressor. |
The same as above with the addition of the front brakes. |
The last picture didn't want a caption for some reason. It is the IRS pumpkin once it was installed a second time. We had to take it back out to do a little work to make the bushings fit snuggly.
ReplyDelete